the strategy depends on MACD indicator and Bolingar Bands .
lot size = 2, stop loss and take profit depends on BBands. entry
depends on MACD indicator.
Версия:
Дата:
Статус:
Описание:
1
31.03.2021
Not running
the strategy depends on MACD indicator and Bolingar Bands .
lot size = 2, stop loss and take profit depends on BBands. entry
depends on MACD indicator.